3280 peachtree road, ne – terminus 100
Project Scope: The applicant is requesting to reconfigure internal vehicular access throughout the site, modify landscaping and walkways in the pedestrian area and add new façade treatments and awnings to several ground-floor locations. The project includes a small increase in retail space to the ground floor under the garage structure. Along Piedmont Road, the applicant proposes to landscape a portion of the currently paved supplemental zone and modify a storefront. No change to use or fenestration is proposed.
Click on the image below to download all documents.
Applicant: Ryan Howard
Also with the Applicant: Corey Lee, Charles Zakem, Woody Galloway, John McColl
SAP: 26-202
Recommendations Regarding Variations:
None required
Additional Recommendations:
The committee commended the applicant’s proposal and recommended approval of it.
The Development Committee does NOT expect to see this applicant again provided no significant changes need to be made to the proposed plans that necessitate additional variations, and the City staff and/or Neighborhood Association requests additional input from the DRC.